Standby generator installation in New Orleans
In New Orleans a generator is not a luxury item, it is the difference between riding out four days of no power at home and packing the car. The install is what decides whether it actually starts when you need it.
- Fuel
- Natural gas or propane
- On-site time
- 1–3 days depending on scope
- Estimate
- Free, on site
Two honest options, at very different prices
Most people call asking about a whole-home standby unit because that is what the ads show. It is often the right answer. It is not always the right answer, and the cheaper option is worth hearing first.
A portable generator with a proper interlock kit and inlet box. Far cheaper than a standby system, and that assumes you already own or will buy the generator itself. You start it yourself, you refuel it, and you pick which circuits run. It covers a refrigerator, some lights, fans, a window unit and your phones. For a lot of households that is genuinely enough, and it is a quarter of the cost.
A whole-home standby unit with an automatic transfer switch. The larger investment of the two. It runs on natural gas or propane, it starts itself within seconds of an outage whether or not you are home, and it can carry central air. If you have someone in the house on medical equipment, if you travel, or if you are not going to be the person outside in a storm pull-starting a motor, this is the one.
What we will not do is quote you the expensive one without telling you the cheap one exists.
The part that matters most: sizing
An undersized generator is the most common problem we get called out to fix, and it is always someone else's install. It runs fine until the air conditioning compressor tries to start, then it stalls or nuisance-trips. Sizing comes from a load calculation, not from the square footage of the house and not from what the neighbor bought.
The calculation has to account for starting current, which for an air conditioning compressor is several times its running current for a moment. That momentary draw is what sinks an undersized unit.
What a proper install includes
- Load calculation and unit sizing against what you actually want running, not a guess.
- The transfer switch. Automatic for standby, a mechanical interlock for portable. Either way it has to make it physically impossible to backfeed the utility line. Backfeeding kills linemen. This is not a corner anyone gets to cut, and an extension cord run into a dryer outlet is exactly that corner.
- The pad and the setback. Standby units need a level base and a required clearance from windows, doors and vents, because the exhaust is carbon monoxide.
- Fuel. Natural gas or propane. The gas line and its sizing are a licensed gas fitter's work, coordinated with ours — a generator on an undersized gas line starves under load.
- Permit and inspection through the City of New Orleans, same as any other service work.
- A load test before we leave, so the first time it runs is not the first night of the storm.
Timing, in a city with a season
The worst time to buy a generator is the week a storm is named. Units go out of stock regionally, every electrician in the metro is booked, and permit offices are dealing with the same surge. Hurricane season here runs June through November and peaks in September. The install to plan is the one that happens in February.
If you already have a unit sitting in the garage from last year, it needs to be started and run under load periodically or it will not be there for you. A standby unit exercises itself weekly; a portable does not.
After the storm
If your generator will not start or will not carry the load during an outage, we take those calls. See 24/7 emergency service. If your panel or meter took water or wind damage, that is a service repair question first — a generator cannot feed a damaged panel safely.
Recent work
Every photo below is a TK Electric job in the New Orleans area, not stock photography.
Get a straight answer on your generator installation
Tell us what is going on and we will give you an honest assessment and a fair price. Family owned, licensed and insured, serving New Orleans for over 20 years.
Request a free estimateOr call or text (504) 514-8224
Common questions
How much does a whole-home generator cost in New Orleans?
A whole-home standby system with an automatic transfer switch is the larger investment. A portable generator with an interlock kit and inlet box costs a fraction of that and covers essential circuits rather than the whole house. Both are quoted free on site.
What size generator do I need?
It comes from a load calculation against the circuits you actually want running, including the starting current of your air conditioning compressor. Undersizing is the most common installation mistake, and it shows up as the generator stalling when the AC kicks on.
Can I just plug a generator into an outlet?
No. Backfeeding a generator through a dryer outlet or an extension cord energizes the utility line outside your house and can kill a lineman working to restore power. Every legitimate connection uses a transfer switch or a mechanical interlock that makes simultaneous connection physically impossible.
Do I need a permit for a generator installation in New Orleans?
Yes. The electrical work and transfer switch require a permit and inspection through the City of New Orleans Department of Safety and Permits. Gas line work is done by a licensed gas fitter and coordinated with the electrical installation.
When is the best time to install a generator?
Well before hurricane season, which runs June through November and peaks in September. Once a storm is named, units sell out regionally and every electrician in the metro is booked. Off-season installs are faster and less stressful.
Will a standby generator run my central air?
A properly sized one will. That capability is a large part of why standby systems cost what they do, and it is the specific thing an undersized unit fails at.